Project

The turnkey project aims at the development and operation for 25 years of a PV solar farm with 15 MWp installed capacity at Bednayel area in the Bekka Region. The project is designed for delivering 27,000 MWhr/year, and includes medium voltage transmission lines to Electricité Du Liban substation in BednayelRegion.

The PV farm shall occupy 15 hectares of a hilly area outside the Bednayeltown. Although the project will have a significant socio-economic impact through improving the electrical power supply situation, yet potential impacts on landscape, soil and groundwater, and other environmental parametesmight arise.

An Environmental Impact Assessment study was conducted to address the full potential impacts likely to be generated by the Project.

Assignment

The following tasks were undertaken during the EIA study