Project

Exide Al Dobowi set up a new battery manufacturing facility in Technopark, Dubai.
The production process involves: Receipt of Lead and Other Raw Materials, Grid Casting, Oxide Manufacturing, Paste Mixing, Pasting, Curing, Plate Parting and Lug Brushing, Assembly, Battery Charging (Wet Formation)

Assignment

The scope of work of the EIA study included:

The scope of work of the RA study included:

Project undertaken by KEC team member