Project

The objective of this study is to carry out an Environmental Impact Assessment for the Yas Island STP with capacity of 57,000 m3/day.

Metito Overseas Ltd, commissioned Kassia to conduct an EIA study according to Abu Dhabi Environmental Agency (EAD). The study aimed at achieving the following:

Assignment

The assignment was carried out in two stages: (1) the preparation of a Terms of Reference report, and (2) the preparation of Operational Environmental Management Plan since the study was undertaken when the project was bring constructed. The following tasks were completed during the two stages: